sensified · SDV Engineering & AI-native Engineering Workbench

Forward deployment in eight weeks

Your own Engineering Workbench, productive on your tool chain in eight weeks

No months-long IT pre-project and no unprotected cloud pilot: our forward deployed engineers from control-unit development set up your dedicated 5-layer instance, connect your leading tools read-only, and bring a high-impact V-model workflow into your team's daily work.

Dedicated single-tenant instance (EU cloud or on-premise)Polarion, DOORS, Codebeamer, Jira, and Git stay in chargeFixed price with a measured before-and-after proof

Starting point

Why standard pilots stall in automotive engineering

Isolated playgrounds with synthetic data

A prototype on sample documents rarely survives first contact with grown DOORS modules, variant attributes, and thousands of cross-references.

Blocked by InfoSec, safety, and procurement

Without physical program separation, local standards custody, or a tamper-proof audit trail, sign-off stops before the first series project.

AI teams without control-unit practice

Anyone who has to learn SYS.2, SWE.1 through SWE.6, ASIL decomposition, and MISRA criteria at the customer burns your principal architects' time.

The process

The 8-week process in detail

Our forward deployed engineers own the engagement: engineers with their own series practice in control-unit, middleware, and safety projects, who work directly with your system architects, quality owners, and your IT.

Weeks 1 to 2

Scoping, baseline measurement, and Layer 0

Delimiting the project slice, measuring today's process cycle time, IaC deployment of your single-tenant instance, IdP/SSO coupling, and gateway policies.

Effort on the customer side
About 4 to 6 hours per week
Acceptable milestone
Delimited project slice, documented baseline measurement, and running Layer 0.
Weeks 3 to 4

System connection and triple index

Read-only connection of up to two systems of record, building the vector, identifier, and structure-graph index, and mapping your object schema into the PostgreSQL ontology.

Effort on the customer side
About 3 to 5 hours per week
Acceptable milestone
Two connected primary systems and a calibrated triple index on your data.
Weeks 5 to 6

Rule calibration and gold-set check

Tuning the 26 deterministic checking rules to your policies, comparing the role agents against a blind gold set from your experienced engineers, and enabling the sign-off workflow.

Effort on the customer side
About 6 to 8 hours per week
Acceptable milestone
26 checking rules tuned to your policies, gold set passed, sign-off workflow active.
Weeks 7 to 8

Team daily work, re-measurement, and acceptance

Accompanied use in your team's day-to-day work, collecting the after-state process values, handover of the impact report, data-flow evidence, and operating documentation.

Effort on the customer side
About 4 to 6 hours per week
Acceptable milestone
Accepted workflow in daily team work, impact report and operating documentation handed over.

CISO, IT, and program checklist

What needs to be ready on the customer side

Preparation stays lean. For a smooth start of the eight weeks we need these four commitments from your organization.

01

Read access to selected systems of record

A read-only service account on up to two leading systems such as Polarion, DOORS, Codebeamer, Jira, or Git.

02

One pilot subsystem

A real, delimited project slice with genuine requirements, architecture, and test cases instead of synthetic sample data.

03

A named domain owner

A decision-capable contact from system, software, or safety engineering who clarifies policies and provides the gold set.

04

Operating decision

The decision on whether the dedicated instance is deployed in your EU cloud or in your own VPC.

Acceptance criteria

Four measurable results after week eight

The rollout is a work contract with clear acceptance criteria. At the end of the eighth week, development leadership, quality management, and the CISO hold four verifiable results in hand.

01

Your sealed single-tenant instance

Built via infrastructure-as-code in your environment, connected to your company IdP, with separate storage and keys per program and a technical HTTP 403 block for non-approved model routes.

02

A calibrated V-model workflow in production

For example the deterministic quality and modality check of requirements or the multi-hop change analysis like SYR.0009 across up to two connected primary systems, including a human sign-off step.

03

A verifiable impact report without personal scoring

An objective comparison of cycle times, inconsistencies found, and rework effort against the baseline from week one, fully aligned with codetermination requirements.

04

An enabled core team and a clean decision basis

Your engineers master the checking and sign-off procedures on their own project; on this factual basis you freely decide on operation (K-2) and expansion (K-3).

Proof in the product walkthrough

The four evidence steps of the SYR.0009 case

Calibrated on the real project slice, the walkthrough shows how a changed requirement line is checked deterministically, analyzed across four V-model stages, signed off by the engineer, and documented in a SHA-256 audit trail.

01 · Change intake

Change intake and requirement check

02 · Impact analysis

Multi-hop impact analysis

03 · Engineer sign-off

Test and evidence draft with engineer sign-off

04 · Audit trail

Documented audit trail

Go to the interactive product walkthrough

Let us review your tool chain and the project slice with the greatest leverage in 45 minutes.

You are currently viewing a placeholder content from Cal.com. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

Book a 45-minute architecture session

FAQ

Frequently asked questions

Why does the rollout take exactly eight weeks?

The technical 5-layer platform is ready for production. What decides verifiable findings, however, are your object attributes, your variant logic, and your sign-off roles. In eight weeks our forward deployed engineers calibrate the data model, connectors, and the 26 checking rules directly on the real project slice, until your team works with reliable results.

How much effort is required on our side?

The rollout is deliberately kept lean. Over the eight weeks your team typically invests 4 to 8 hours per week, mainly for scoping, providing read access, the blind gold set, and acceptance. Our engineers handle the deployment of the instance and the connection.

What access do you need to our systems?

A read-only service account on up to two leading systems such as Polarion, DOORS, Codebeamer, Jira, or Git. In the rollout we connect read-only; controlled write-back paths after engineer sign-off follow on request only in the modular expansion (K-3).

Is the rollout a non-binding pilot?

No. K-1 is a work contract with clear acceptance criteria and a fixed price. At the end of the eighth week we hand over four verifiable results: your sealed instance, a productive workflow, the impact report, and an enabled core team.

How does operation stay within budget?

The EU AI gateway limits model costs per project room and team technically, warns at 80 percent, and stops calls at 100 percent until you release them. You settle model and cloud usage with zero markup directly with your providers.