For program and release management

Relief in the war room and a blocker list that gets shorter every week

You hold the critical path together while the ticket backlog grows and the next sample milestone moves closer. Our Tiger Team joins as a practised unit, analyses faults reproducibly instead of by guesswork and reduces the blocker list against measurable targets every week.

Verified delivery record

> 18,000 hacross 23 turnaround and task force mandates on the critical path of demanding series launches
72 hto the first reproducible fault picture from the on-site diagnosis (package S-1)
1 weekuntil the core team works at full productivity on the critical path, without lengthy onboarding

Your perspective

Specialist knowledge on the critical path instead of extra junior capacity

Unstable builds shortly before the sample milestone and hundreds of open findings before the ASPICE gate cannot be solved with more heads. Our core team brings the experience to where your program is stuck.

Reproducible fault analysisTiming, memory and integration faults are isolated in a traceable way in C++17, AUTOSAR, QNX and on SIL and HIL test benches, not prioritised by gut feeling.
Immediate relief in the war roomThe team takes on the critical work packages together with you, keeps the daily clean and frees you up for steering and alignment with the specialist teams.
Measurable reduction each weekFault fixing, integration, test automation and evidence work run on a weekly cadence against agreed reduction targets with weekly proof of progress.

Acceptance criteria

How you measure progress

Matching packages

Two defined routes for the rapid engagement

Both packages are listed transparently with entry point, duration and accepted result under Services and pricing.

S-1

Architecture and traceability diagnosis

Entry point
On-site and system start within ten working days of the order
Duration
Five to ten working days
Accepted result
A solid technical assessment with a prioritised traction plan and effort estimate at a fixed price
S-2

Tiger team traction

Entry point
Immediately after the diagnosis, with a committed start date
Duration
From six weeks until the stability criterion
Accepted result
Critical path cleared, defined blockers and traceability gaps closed, documented handback
See all terms

Other perspectives

Tiger Teams from the view of your role

Tell us about the critical path, the biggest blockers and your next sample milestone. We start with the on-site diagnosis and bring the core team to full productivity within one week.

You are currently viewing a placeholder content from Cal.com. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

Request a diagnosis engagement

FAQ

Frequently asked questions

How quickly is the team productive?

Within one week the practised core team works at full productivity on the critical path. It takes on the critical work packages together with you, without you having to supervise a lengthy onboarding.

How do you isolate the root causes?

Reproducibly rather than by guesswork: timing, memory and integration faults are isolated in a traceable way in C++17, AUTOSAR, QNX and on SIL and HIL test benches and prioritised with evidence.

How do I keep an overview of progress?

Fault fixing, integration, test automation and evidence work run on a weekly cadence against agreed reduction targets. Every week you receive proof of progress on the blocker list.

Does the work stay usable for the ASPICE gate?

Yes. The evidence is created together with the work, not afterwards. Hardened regression tests and a complete traceability chain secure the resolved root causes for good.

How does the handback to my team work?

Orderly and documented: resolved root causes, hardened tests and a clean transfer to your line team so that no loose ends remain after the engagement.